§ 9. Same—Permit fees.  


Latest version.
  • (a)

    Minimum ..... $16.00

    (b)

    Service entrance switch charge:

    (1)

    Through 60 amps ..... 8.00

    (2)

    Through 100 amps ..... 12.00

    (3)

    Through 200 amps ..... 14.00

    (4)

    Through 400 amps ..... 16.00

    (5)

    Through 600 amps ..... 18.00

    (6)

    Through 800 amps ..... 20.00

    (7)

    Above 800 amps ..... 22.00

    (8)

    Temporary meter ..... 16.00

    (9)

    Correct wiring for occupancies ..... 16.00

    (c)

    Circuit charge:

    (1)

    Each branch circuit ..... 3.00

    (2)

    Each feeder circuit ..... 6.00

    (d)

    Reinspection ..... 16.00

    (e)

    Motor installation charge:

    (1)

    Fractional hp ..... 3.00

    (2)

    1—2 hp ..... 6.00

    (3)

    3—5 hp ..... 8.00

    (4)

    7½—10 hp ..... 10.00

    (5)

    15—25 hp ..... 12.00

    (6)

    30—100 hp ..... 16.00

    (7)

    150—200 hp ..... 20.00

    (8)

    250 hp and above ..... 24.00

    (f)

    Temporary cut-in :

    (1)

    Mobile home ..... 16.00

    (2)

    Commercial building (good for 90 days) ..... 16.00

    (g)

    Distribution fee. Outside electrical distribution systems, both overhead and underground:

    (1)

    Each transformer or bank of transformers ..... 16.00

    (2)

    Overhead or underground (meter to branch circuits) service, per foot ..... 0.13

    (h)

    Double fee. A double permit fee will be charged on all of the above-mentioned permit fees if construction is started before the permit is approved.

(Ord. No. 1-1961, § 1, art. XXXIX(a), (b), 1-11-1961; Ord. No. 9-1961, 9-20-1961; Ord. No. 9-1980, 10-8-1980; Ord. No. 4-1988, App. C, § 1, 10-12-1988; Ord. No. 16-1991, § 3, 11-11-1991)

Cross reference

Fees established, § 22-117.